RCC framed structure as per structural design for G+2 floors |
|
Brick / fly-ash walls 9" thick for outer & 41/2" thick for inner walls |
|
Plastering with 43 grade cement |
|
Joineries:
- Main Door: Teak wood frame + Masonite panel shutter - polished finish
- Bedroom Door: Padauk frames + Masonite panel shutter - painted finish
- Toilet Doors: Flushed shutter with plastic coating - painted finish
- Windows: Padauk frames & shutters with glass panels - painted finish
|
|
Grills: MS Square bars, painted finish |
|
Flooring & Tiling:
- Hall and Dining: 24" X 24" joint free vitrified tile
- Bedrooms & Kitchen: 16" X 16" ceramic tile
- Bathrooms: 12" X 12" non-skid ceramic tile
- Bathroom walls: 7' dado of 8" X 12" glazed ceramic tile
- Above counter for kitchen: 2' ht dado of 8" X 8" glazed ceramic tile
|
|
Electricals:
Anchor, Havell's or equivalent electrical solutions, 3 phase power supply, DB & auto-phase changer Necessary AC, TV cable, Telephone, light, fan & geyser points |
|
Bathroom Fittings:
Sanitary fixtures: Wash basin & EWC (ordinary, white)
C.P. Fittings: Pillar cock, 2-in-1 wall mixer, provision for geyser |
|
Painting: Cement primer + cement paint - 2 coats |
|
Kitchen Counter :
Black granite counter & single bowl S.S. sink. |
PAYMENT SCHEDULE :
- 5% on booking & confirmation.
- 60% at the time of Registration
- 3% Installments for 10 months from start of construction
-
5% At the time of handover
|
PROJECT COMPLETION :
- Subject to Force Majeur Conditions, the project shall be completed in 18 months time from the date of DTP approval.
|