Elevator |
|
Security & maintenance room |
|
Intercom facility |
|
G.F. level stilt parking for 8 cars (at extra cost per parking stall) |
|
Paved driveway for vehicular access to stilt parking |
|
Pre-construction treatment for termite protection |
|
Sump of 14000 liters capacity |
|
Common OHT of 12000 liters capacity |
|
Bore well |
|
Compound wall + gate |
|
Landscaped areas along perimeter of property |
|
Common terrace area + parapets with party area |
|
Common Recreation Room |
|
Optional one-stop package for wardrobes, Modular kitchen, & other interior appointments offered (at extra cost) |
|
|
RCC framed structure of 1:1½:3 (M20 grade) mix with 53 grade cement, reinforced as per structural design for stilt + 4 floors. |
|
Brick work for 9” thick outer & 4 ½” thick inner walls |
|
Plastering with 43 grade cement
|
|
Joinery:
- Doors: Padauk frames.
- Main door: Masonite 2 panel shutter – polished finish.
- Bedroom doors: Masonite 2 panel shutter – painted finish.
- Toilet doors: Flushed shutter painted finish with plastic coating.
- Windows: Padauk frames & shutters; glass panels; painted finish.
|
|
Grills: MS Square bars, matt enamel painted finish |
|
Flooring:
- 18” x 18” joint free glazed porcelain tile for hall / dining.
- 16” x 16” Ceramic tile for bedrooms & kitchen.
- 12” x 12” non–skid ceramic tile for bathrooms.
- 7’ ht dado of 8” x 12” tile for bathroom walls.
- 2’ ht dado of 8” x 8” above counter for kitchen.
|
|
Electrical:
Using Anchor cables & Anchor ROMA modular switches or equivalent. 3 phase power supply DB & auto-phase changer.
Total no. of points in flat
Room |
TV/Tele |
Light |
Fan |
5A |
15A |
Hall |
1+1 |
3 |
1 |
3 |
1 |
Dining |
|
2 |
1 |
2 |
1 |
Bedroom - 1 |
1+1 |
2 |
1 |
2 |
1 |
Bedroom - 2 |
|
2 |
1 |
2 |
1 |
Bedroom - 3 |
|
2 |
1 |
2 |
1 |
Toilet - 1 |
|
2 |
|
1 |
1 |
Toilet - 2 |
|
2 |
|
1 |
1 |
Toilet - 3 |
|
2 |
|
1 |
1 |
Kitchen |
|
2 |
1 |
4 |
2 |
Washing machine |
|
|
|
|
1 |
|
4 |
19 |
6 |
18 |
11 |
Total points: |
58 |
|
|
Bathroom Fittings:
Wall–hung wash basin, EWC closet cascade model, C.P. fillings – pillar cock & 2–in –1 wall mixer, provision for geyser in each bathroom. |
|
Kitchen Counter :
Black granite counter & 1 bowl drain board S.S. sink. |
|
Washing Machine point to be provided. |
|
Service Balcony provided as annexed to kitchen. |
PAYMENT SCHEDULE :
- 5% On booking & confirmation
- 40% at the time of Registration
- 5% Installments for 10 months from start of construction
-
5% At the time of handover
|
PROJECT COMPLETION :
- Subject to Force Major Conditions, the project shall be completed in 12 months time from the date of DTP approval.
|